Size Selection



Size Selection Clear Opening of the Frame Should Not Be Smaller Than that of Chamber

Size Selection

Handling & Installation



Handling Everlast composite manhole covers, sewer manhole covers, iron manhole covers, frames & iron gratings, sewer gratings have very good load carrying capacity. Transportation and handling at the time of installation should be made carefully to avoid damage of corners & edges.

Installation Procedure
  • Prepare concrete bed considering height of frame.
  • Frame should be embedded in 300 x 200 mm of minimum M-20 grade concrete.
  • Make sure that top level of frame should match with the road.